See your home powered differently.
Explore the proposed Tesla solar, storage and backup system in 3D.
Original supplied imagery; map imagery © Google as identified in the proposal. The 3D building is an approximation, not a surveyed replica.
3D graphics are unavailable
Open this HTML in a current Chrome, Edge or Safari browser with WebGL 2 enabled. The energy simulator and roof reference remain available.
Power sources right now
Animated directions follow the selected time and load.
Energy paths are conceptual, not actual conductor routing. Battery flow is modeled as a combined bank, and the generator may serve only separate approved loads.
Solar & battery timeline
Explore energy through daylight and darkness.
64.8 of 81 kWh
From the start of this scenario
From the selected point
How this estimate works
Uses an illustrative 6 AM–6 PM solar curve, repeated daily, with adjustable peak solar, constant selected loads, 81 kWh nominal storage, 90% charging and 95% discharging efficiency and an adjustable modeled minimum. Solar and storage share the assumed AC limit. No grid charging, export, real weather, surge loads or actual hourly usage are modeled. A daylight recovery assumes the system can restart and solar recharge is available; restart from depletion is not guaranteed. Generator power, if assumed, is limited to a separate circuit and the selected fuel/runtime window, and never charges the batteries. This is a scenario estimate, not a site-specific prediction or guarantee.
Energy paths right now
Grid availableWhat is being illustrated?
This interactive model follows the Rev 4 roof-group schedule and proposed battery split: 67.5 kWh in a garage and 13.5 kWh on a candidate exterior wall. The house envelope, façade, garage arrangement, mounting positions, equipment scale, load areas and animated paths are illustrative, not verified as-built measurements. The proposal price remains $159,264.00; the visualization does not change its scope.
Engineering assumptions and references
Original roof layout: south 53 + 9 modules, east 11 and west 11. Three full Powerwall 3 units and three Expansion units (all expansions connected to the leader). Final mounting, conductor routing, fire separation, local approval, utility interconnection and load coverage remain to be verified.
Source: supplied Blackmon solar proposal and PV plan set, Rev 4. Manufacturer references: Powerwall operation, system design, and generator considerations. Existing generator compatibility, ATS wiring, whole-home backup and elevator operation are not established. No generator-to-battery charging is modeled.
All kW and kWh flows are interactive illustrative inputs, not a production simulation or warranty. The model assumes aggregate usable AC solar, simplified battery efficiency (90% charge, 95% discharge), 81 kWh nominal starting capacity, and a configurable minimum state of charge; actual usable capacity, conversion losses, reserve behavior, inverter/PCS limits, start-up surges and operating controls may differ. No export is modeled; surplus is curtailed in the example. During an outage, PV generation requires an operating, properly commissioned backup system.